    Project Overview

    The Story Behind the Build

    A landmark commercial development in Chennai's OMR technology corridor, this IT park was conceived as a next-generation workspace. The design prioritises collaborative environments, energy efficiency, and technological infrastructure that future-proofs the building for decades. With LEED Gold certification as a target from day one, the project pushed the boundaries of sustainable commercial construction in Tamil Nadu.

    Client Requirement

    The client, a leading SaaS infrastructure firm, needed a Grade-A office complex with LEED Gold certification, 500-seat capacity across 4 floors, a data centre, cafeteria, and scalable MEP infrastructure for future expansion.

    Challenges Faced

    Rocky terrain demanded controlled blasting and heavy-duty piling. Coordination of 15+ subcontractors across MEP trades while maintaining a fast-track 14-month schedule required real-time project management using BIM 360.

    The Outcome

    Achieved LEED Gold with 92/110 points. The building was fully leased within 60 days of completion, and the client has commissioned Phase 2 with an expanded scope. The project was awarded 'Best Commercial Project 2023' by the Chennai Builders Association.

    Project Details

    Project NameIT Park Phase 1
    LocationOMR, Chennai
    CategoryCommercial
    Built-Up Area50,000 sq.ft
    Year2023
    StatusCompleted
    Discuss Your Project
    Visual Showcase

    Project Gallery

    IT Park Phase 1 - Image 1
    IT Park Phase 1 - Image 2
    IT Park Phase 1 - Image 3
    IT Park Phase 1 - Image 4
    IT Park Phase 1 - Image 5
    IT Park Phase 1 - Image 6
    Key Features

    Project Highlights

    LEED Gold Certified

    92/110 points — top-tier sustainability

    Energy Efficient

    30% below ASHRAE baseline energy use

    Tier-3 Data Centre

    Redundant power & cooling infrastructure

    500+ Capacity

    Flexible open-plan with breakout zones

    Our Process

    Construction Timeline

    01

    Pre-Construction

    Geotechnical survey, design development & permitting

    8 Weeks
    02

    Substructure

    Piled foundation, basement excavation & waterproofing

    6 Weeks
    03

    Superstructure

    Steel-concrete composite frame, curtain wall installation

    16 Weeks
    04

    MEP & Interiors

    HVAC, fire safety, electrical & fit-out works

    14 Weeks
    05

    Commissioning

    Systems testing, LEED documentation & occupancy permit

    4 Weeks
    Quality Assured

    Materials & Technology

    Structural Steel (Fe500D + ISMB Sections)
    Post-Tensioned Slabs
    Unitised Curtain Wall — Saint-Gobain
    VRF HVAC Systems — Daikin
    Raised Access Flooring
    Fire-Rated Gypsum Partitions — Gyproc
    "The Janalokaa team delivered a world-class tech park that stands shoulder to shoulder with any Tier-1 developer project. Their BIM-driven approach eliminated clashes and saved us significant time during MEP coordination."

    Arun Prakash

    CEO, NovaGrid Technologies

    Inspired by This Project?

    Let's build something extraordinary together. Get a free consultation and quote from our expert team.